Protection Relay Testing & Commissioning

Functional testing, setting and final verification of overcurrent, distance, differential and transformer relays.

Protective relays are the most important line of defence in a substation: a wrong setting or an incomplete logic can mean a wide-area outage or damage to expensive equipment. At ENP, relay testing is more than "inject and record a number". Our process starts with the coordination study and setting verification, continues with functional, logic and trip-circuit testing, and ends with an official report and the final as-left setting file.

Relays we cover

Relay typeANSI codeTypical application
Phase & earth overcurrent50 / 51 / 50N / 51NFeeders, transformers and motors
Directional overcurrent67 / 67NRing networks and parallel feeders
Distance21 / 21NTransmission and sub-transmission lines (63, 132, 230, 400 kV)
Transformer differential87TMain protection of power transformers
Line / bus / generator / motor differential87L / 87B / 87G / 87MUnit protection with defined zones
Transformer auxiliary protection49 / 64REF / 63 / 26 / 71 / 90Thermal, restricted earth fault, Buchholz, temperature, oil level, tap changer
Voltage & frequency27 / 59 / 59N / 81Under/over-voltage, neutral displacement, frequency
Auto-reclose & synchro-check79 / 25Automatic reclosing and synchronism check
Breaker failure & lockout50BF / 86Back-up tripping and circuit lockout

Common ANSI device numbers

ANSIFunctionDescription
21 / 21NDistance (phase / ground)Phase and ground distance protection
25Synchro-checkSynchronism check before closing a breaker
27UndervoltageVoltage drop
32Directional / reverse powerDirectional and reverse power
37Undercurrent / underpowerLoss of load or power
40Loss of excitationGenerator field failure
46Negative sequence overcurrentLoad unbalance
47Phase sequence voltageVoltage sequence and unbalance
48 / 51LRIncomplete sequence / locked rotorMotor long start and stall
49Thermal overloadThermal protection
50 / 51Instantaneous / time overcurrentPhase overcurrent
50N/G / 51N/GEarth fault (inst. / time)Earth-fault protection
50BFBreaker failureBreaker failure protection
59 / 59NOvervoltage / residual overvoltageOvervoltage and neutral displacement
60Voltage / VT supervisionVT fuse-failure supervision
63Pressure / BuchholzTransformer gas and pressure relay
64REFRestricted earth faultTransformer restricted earth fault
66Starts per hourMotor start limitation
67 / 67NDirectional overcurrent / earth faultDirectional protection
68 / 78Power swing / out-of-stepPower swing blocking and out-of-step
74TCTrip circuit supervisionTrip circuit health monitoring
79Auto-recloseAutomatic reclosing
81U / 81O / 81RUnder / over frequency, df/dtFrequency protection
85Communication-aided protectionTeleprotection schemes
86LockoutLockout relay
87B / 87T / 87G / 87L / 87MDifferential (bus / transformer / generator / line / motor)Unit differential protection
90Voltage regulationVoltage and tap-changer control
94Tripping / trip-freeTripping relay

Brands and families common in Iranian substations

BrandFamilies (examples)Typical useSetting software
SiemensSIPROTEC 4: 7SJ61/62/63/64, 7SA52/522/6, 7UT61/63, 7SD52/61, 7SS52, 7UM62 — SIPROTEC 5: 7SJ82/85, 7SA86/87, 7UT82/85/86/87, 7SD82/86/87, 7SL86/87 — SIPROTEC Compact: 7SJ80, 7SK80 — Reyrolle 7SRMV feeders, distance, transformer and line differential, busbar, generatorDIGSI 4 / DIGSI 5 / Reydisp
Schneider ElectricSepam series 20/40/60/80 — Easergy P3 / P5 — MiCOM Agile (P14x, P44x, P54x, P64x)MV feeders, transformers, motors, distance and differentialSFT2841 / SFT2885 / Easergy Pro / MiCOM S1 Agile
GE (Multilin / Grid Solutions)750/760, 350/345/339, F650/F60/F35, T60/T35, D60, L90, B30/B90, G60, M60, 469Feeders, transformers, lines, buses, generators and motorsEnerVista UR Setup / EnerVista 650 / SR3 Setup
ABB / Hitachi EnergyRelion: REF615/620/630, RET615/620/670, REM615/620, REL670/650, RED670, REB670, REG670 — legacy: SPAJ, SPAA, SPAD, REL316/511, RADHDMV feeders, transformers, motors, lines and busesPCM600 / PCM
SELSEL-351, 311C/311L, 387, 487, 751, 710, 787, 421Oil & gas, petrochemical and industrial networksAcSELerator QuickSet
Areva / Alstom (MiCOM)MiCOM P12x/P13x/P14x, P44x, P54x, P63x/P64x, P74x — legacy: K series and MCGGOlder transmission and distribution substationsMiCOM S1 Agile / S1 Studio
Toshiba / MitsubishiGRD, GRL, GRT — MELPROPower plants and older substationsManufacturer software for each model
NR Electric / SifangPCS-9xxx, CSC-xxxSome recent projectsPCS-Explorer / manufacturer software

The list shows examples of the most common models and is not exhaustive. If your relay is not listed, please contact us anyway.

Relays in LV and MV substations

Voltage levelTypical devices and relaysKey tests
Low voltage LV (400 / 690 V)Trip units of air and moulded-case breakers (Schneider Micrologic, Siemens ETU, ABB Ekip/PR), motor protection (Siemens SIMOCODE, Schneider TeSys T), earth-leakage relaysLR (overload), SD (short-time), I (instantaneous) and G (ground) tests with a test kit or primary injection, earth-leakage test, trip-circuit test
Medium voltage MV (6.6 / 11 / 20 / 33 kV)Feeder, transformer, motor and capacitor relays (Sepam, Easergy, REF615, 7SJ, MiCOM P12x/P14x, GE 350/750, SEL-751)Overcurrent and earth fault, directional, auto-reclose, panel logic and interlocks, trip and breaker-control circuits
High voltage HV (63 / 132 / 230 / 400 kV)Distance, line / transformer / bus differential, breaker failure (7SA, REL670, P44x, D60, 7UT, RET670, 7SS52, REB670)Impedance characteristic, zones and teleprotection, differential stability, end-to-end test with GPS synchronization

Relay settings

Settings must come from the short-circuit and protection coordination study. We receive the settings from the consultant or operator, load them into the relay and verify every parameter one by one, not only what is visible on the relay display. Typically checked and recorded:

  • CT and VT ratios, secondary rated current (1 A / 5 A), CT polarity and phase sequence
  • Pickup values, time multiplier (TMS / time dial) and curve type
  • Setting groups (1 to 4) and group-change conditions
  • Binary I/O mapping, LEDs and trip matrix
  • Programmable logic, interlocks and auto-reclose
  • Communication parameters: IP, IEC 61850, IEC 60870-5-103, Modbus, DNP3 and time sync (SNTP / IRIG-B)
  • Passwords, access levels and file versions (As-Found and As-Left)

Standard inverse-time curves (IEC 60255-151)

Formula:

t = TMS × k / ((I / Is)^α − 1)
Curvekα
Standard Inverse (SI / NI)0.140.02
Very Inverse (VI)13.51
Extremely Inverse (EI)802
Long-Time Inverse (LTI)1201

Typical setting values (for orientation only)

ProtectionParameterTypical value
Phase overcurrent (51)Pickup110 to 130 % of maximum load current
Earth fault (51N)Pickup10 to 20 % of CT rated current (depends on system earthing)
Distance (21)Zone 1 / Zone 2 / Zone 380–85 % of line / 120 % of line or line + 50 % of adjacent line / longer back-up zone
Transformer differential (87T)Minimum pickup / slope0.2 to 0.3 In / dual slope, e.g. 25 and 50 %
Transformer differential (87T)Harmonic restraint2nd harmonic about 15–20 %, 5th about 20–35 %
Over / undervoltage (59 / 27)PickupAbout 110–115 % and 80–90 % of rated voltage

Final values always come from the project's coordination study and the manufacturer's manual; the table above is for orientation only.

Testing method

  • Initial inspection: panel condition, wiring, terminals, DC supply, CT and VT circuits and earthing
  • Three-phase secondary injection with calibrated equipment (Omicron, Megger, Doble or equivalent) and recorded test files
  • Pickup / drop-off tests and timing against the curve
  • Distance characteristic on the impedance plane, directional checks, differential bias characteristic, harmonic restraint and stability on external faults
  • Logic, interlock, auto-reclose and breaker-failure tests
  • Complete trip chain to the circuit breaker, close and trip commands, trip-circuit supervision
  • Signal tests to SCADA (point-to-point) and GOOSE messages in IEC 61850
  • End-to-end tests for line differential and teleprotection with GPS synchronization
  • On-load checks after energization: current and voltage direction and angle, differential balance

Deliverables

  • Official test report for every relay, on standard forms with numerical results
  • Final as-left setting file and a backup copy
  • Test files and recorded reports (ready for the client and consultant)
  • Commissioning checklist and final acceptance sheet

References: IEC 60255 (measuring relays and protection equipment), IEC 61850 (substation communication), IEC 61869 (instrument transformers).

Scope of work

  • Three-phase secondary injection (Omicron, Megger, Doble)
  • Full setting verification and setting-group loading
  • Logic, interlock, auto-reclose and trip-chain testing down to the breaker
  • Distance, differential and directional characteristic testing
  • Signal tests to SCADA and GOOSE (IEC 61850)
  • LV, MV and HV relays from Siemens, Schneider, GE, ABB and SEL
  • Official test report and as-left setting file